typical case

Qucheng Tailings Storage Safety Monitoring and Early Warning Program goes live

Dehua County Qucheng Mining Co., Ltd. designed tailings dam total height of 86m (including the initial dam 30m, tailings accumulation dam 56m), forming a total capacity of 5.8 million m³, the design level of the second-class tailings storage. The existing monitoring system in the reservoir area has some aging and damaged sensors, which can't meet the tailings storage intelligent ...

Mount Lushan Scenic Area Geological Hazard Monitoring Project

 Mount Lushan scenic area of the mountain behind the White Deer Cave Academy loose soil structure, continuous heavy rainfall is very easy to trigger landslides and landslides. Serious threat to the life and property safety of Mount Lu residents and tourists. The company's technical personnel in the White Deer Cave Academy around the disaster risk points installed four monitoring points, for the local flood emergency response to do 24 ...

Yunnan Power Grid Transmission Tower Attitude Monitoring System

Yunnan 500KV Xiao Chu B line 075 and 076 tower transmission pole tower is located in Yunnan Dali Bai Autonomous Prefecture, located in remote villages, 075 tower in the pressure deformation and torsion of the combined force of the combined strain impact, has occurred a slight distortion, has been a serious threat to the surrounding villages of the people's lives and property safety. ...

Geological Hazard Monitoring Project for Landslides on Nanchuan East Road, Xining City, China

Nanchuan East Road landslide group in Xining City, Nanshan west slope, the main hazard for the Nanchuan East Road, Nanyuan residential community, gas station, gas station and the bottom of the slope air raid shelters, the threatened population of 1,342 people, the construction area of about 12,000m2, the landslide hazard level is a first-class, of which the Nanchansi Temple is located in the north of the landslide ...