News Center
News Center
High-speed rail communication base station tower automation monitoring and early warning project launched
On January 8, the person in charge of the technical department of the company, Mr. Wang Mingming, led the technical team to Zhejiang Qingtian High-speed Railway Station for the installation and debugging of Beidou automated monitoring system for high-speed railway communication base station towers, and a total of one continuous operation reference station, two real-time monitoring stations and one real-time meteorological station were built. High-speed rail communication base station tower, as the bearer of wireless ...
January 8, 2017
Xining Nanshan West Slope Landslide Deformation Automated Monitoring and Early Warning Project Launched
On July 29th, Mr. Wang Mingming, the head of the technical department of the company, led the technical team to Xining City, Qinghai Province for the installation and debugging of the automated deformation monitoring and early warning system for the landslide body on the west slope of Nanshan Mountain in Xining. The west exit of Nanshan Tunnel is located halfway up the west slope of Nanshan Mountain, with a design elevation of 2294.86m, the terrain is high in the east and low in the west, with steep slopes, ...
August 31, 2016
Kobelco helps--Nanjing Yangtze River Second Bridge automated monitoring test
On June 6th, Dr. Ke Fuyang, the general manager of the company, led the staff of the technical department of the company to Nanjing Yangtze River Bridge (hereinafter referred to as "the Second Bridge") to carry out the installation and debugging of Beidou automated monitoring system. Nanjing Yangtze River Bridge is a national "Ninth Five-Year Plan" key construction projects, in March 26, 2001 officially opened to traffic. The Second Bridge ...
June 7, 2016
Water Hub Beidou - Automated Monitoring Project Launched
On May 18th, the company's technicians went to Shandong for the installation and debugging of Beidou automated monitoring system for water conservancy hub project. The significance of this project is to replace the traditional total station and level monitoring by using the intelligent, automated, all-weather, omni-directional and high-precision Beidou automated monitoring system to meet the ...
May 22, 2016
Zhang Yusen, Marketing Manager of the company, visited Prof. Chen Shaojie of Longyan College.
On May 16th, 2016, the company's marketing manager Zhang Yusen visited Professor Chen Shaojie of Longyan College, and carried out technical exchanges on the relevant projects to be implemented in cooperation with Professor Chen. Mr. Zhang introduced in detail the "BeiDou automation monitoring and early warning cloud service platform" developed by the company, which integrates BeiDou satellite navigation ...
May 18, 2016
Traveled to Huainan, Anhui Province to perform routine maintenance on the automated surface monitoring system of Pan Yidong Coal Mine.
On May 4, the staff of R&D Department of the Company went to Huainan City, Anhui Province to carry out the routine maintenance of the automatic surface monitoring system of Panji No.1 Coal Mine of Huainan Mining Group (referred to as "Pan Yidong Mine" for short). Pan Yidong Mine was founded in 1973, with a designed annual production capacity of 3 million tons, and its annual production capacity of 1.5 million tons.
May 5, 2016