...

Qiu Cheng tailing pond to realize "online monitoring" full coverage

Total height of designed tailing dam of Dehua County Qucheng Mining Co.86m(of which the initial dam30mTailings impoundment dams56m), forming a total storage capacity580ten thousandThe design grade is second class tailing pond. The existing monitoring system in the reservoir area shows the aging and damage of some sensors, which can no longer meet the demand for intelligent safety monitoring of tailing ponds, and there is an urgent need to equip a more perfect monitoring system.

Under the leadership of project manager Zhu Fan, the company's technical staff built a total of surface displacement, deep displacement, infiltration line, dry beach length, reservoir water level and meteorological monitoring stations, and built a tailings pond intelligent safety monitoring and early warning platform, through the fusion of multi-source heterogeneous information to achieve a comprehensive early warning of the monitoring data of Qiu Cheng tailings pond.

At present, the intelligent safety monitoring and early warning system of Qiu Cheng tailing pond is running stably and the results are reliable.

 

en_US