2016surname Nian4moon13On March 28, 2010, Mr. Wang Mingming, Director of Technology R&D Department of the Company, and his team went to the ash field of Datang Luohu Power Plant in Huainan City, Anhui Province, to carry out the field survey of the project, and to prepare for the implementation of the real-time monitoring project of the deformation of the ash field dam and the infiltration line.
Secretary Meng of Datang Luohu Power Plant in Huainan City, Anhui Province, warmly welcomed the arrival of the company and arranged the person in charge of the site of the ash plant to cooperate with the company throughout the survey, who introduced in detail the situation that the coal ash of the power plant is flushed into the ash field through the pipeline and stored, and said that the coal ash has a wide range of applications in the construction of building materials, and that the secondary utilization of the coal ash not only can be turned into treasure and benefit the people, but also reduce the land of the ash field, reduce pollution and protect the environment, which has significant benefits and social benefits. The secondary utilization of coal ash can not only turn waste into treasure and benefit the people, but also reduce the land of ash field, reduce pollution and protect the environment, which has significant economic and social benefits.
Wang Mingming, director of R&D department of the company, introduced in detail the real-time monitoring system for deformation of the dam body and infiltration line of the ash field, which is developed by the company and integrates the BeiDou positioning technology, computer technology, communication technology, network technology, sensor technology and other high-tech, and said that compared with the traditional measuring means such as total station, level meter, etc., the system has a great advantage in the aspects of intelligence, automation, all-weather, all-around, high-precision, modernization, and it has a great advantage in the field. The advantages of the system are Combined with the survey, Mr. Wang introduced the implementation plan of the system to Mr. Meng and said that our company will do our best to do the project well and continue to research and develop the system integration, so as to better replace the traditional measurement, save manpower and serve the society.
The implementation of this project expands the company's applications in the power sector.
Datang Luohe Power Plant West Small Ash Plant Now